SlideShare a Scribd company logo
1 of 2
Dear Gentlemen,

We have come across your details from website and learn about the activities and works experience in
the field of petroleum engineering projects.

Please be informed, our company and associates are involved in different segments of business,
among those, Agency, Representation, and Tender Consultancy are being conducted by one of our
company Global Consulting Services. We have experience to work with the overseas suppliers,
manufacturers and contractors in the following sectors: (narrated briefly)

    1. Railways: Supplied engineering items, locomotive spare parts, workshop equipment and
         permanent way materials to Bangladesh Railway; Our Principal and manufacturers were from
         Germany, U.S.A., Belgium and U.K.

    2. Water supply and Sewerage System: Supply, Erection and Commissioning of heavy duty
         raw water VT pumps, (surface water), under turnkey contract to Chittagong WASA (water and
         sewerage authority). Manufacturer, supplier, erection and commissioning was done by
         Kirloskar Brothers Limited, Pune-India.

    3. Steel Mills: Supplied and installed 24nos. continuous duty pumps to the reputed steel mills
         with spare and warranty maintenance.

    4. Irrigation pumps: marketed substantial quantity of irrigation mono bloc pumps under rural
         electrification board programmed through dealer’s network across the country;

    5. Experienced in participating many tenders of engineering products, Water supply project
         works pumps, electric motors, spare parts etc.. to the government and public sectors, some of
         those with successful completion.

Please be informed, The Government of Bangladesh, intends to modernize her only crude petroleum
refinery. As sequence of the project implementation, goes for global invitation for: “EXPRESSION OF
INTEREST FOR FINANCING, BMRE Project of the EASTERN REFINERY”.

Basic concept of BMRE: To increase its present capacity from 1.5million TPA to 4.5million TPA The
feasibility study indicates that estimated cost of BMRE project is US$867.00million for the capacity of
3.00 million metric tons per annum. Out of which US$709.00 million will be in foreign currency and
remaining US$158.00 million in local currency. The financial and economic analysis have been carried
out for ERL BMRE project considering three different crude and crude mix processing options. The
result of financial and economic analysis show that the project is highly attractive. The project
generates an after tax return on fixed capital cost of 16.6% (20year average), while IFRR & IERR are
around 20% and 23.5% respectively. The average annual foreign currency saving is US$220 million.
The payback period of the investment is 4.5 years. For smooth transfer of crude oil a single point
mooring and submarine pipe line are being constructed to connect the refinery storage. For SPM
project, selection of Consultant is under process and expected completion time of SPM project is
December 2012.

Now the executing agency, on behalf of the GOB, invited proposal from global interested sources to
submit proposal for financing this BMRE project on any of the following options:

    1)       Build-Own-Operate & Transfer (BOOT)
    2)       Public Private Partnership (PPP)
    3)       Financing only
    4)       Any other suitable option.
The Expressions of Interest to be submitted by 10th August, 2010.
We are looking for a competent company / organization / financer, interested to participate in this giant
project. For your kind information we are maintaining good liaison and connections with the Concerned
Ministry, Lead Agency and the higher ups and confident to work in this project with the team, as local
associate.

We await your response in this matter.

Thanks and Regards
Quazi Shamsud Tarique
Global Consulting Services
“Commercial Court” (5th floor)
95, Agrabad C/A
Chittagong-4100, Bangladesh.
Tel:880-31-720292, 713215, 725722
Fax:880-31-710066
e-mail:qstbiz@gmail.com; mumtazuddinahmed@msn.com

More Related Content

Similar to Global cs ltr

Charles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalphaCharles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalpha
Charlie Graham Twin-c
 
Charles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqpCharles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqp
Charlie Graham Twin-c
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
Empowerhosting
 
11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject
Ian Garbutt
 
NewBase 594 special 30 April 2015
NewBase 594 special 30 April  2015NewBase 594 special 30 April  2015
NewBase 594 special 30 April 2015
Khaled Al Awadi
 

Similar to Global cs ltr (20)

Chad cameroon pipeline project
Chad cameroon pipeline projectChad cameroon pipeline project
Chad cameroon pipeline project
 
Charles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalphaCharles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalpha
 
Charles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqpCharles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqp
 
New base 06 february 2021 energy news issue 1403 by khaled al awadi
New base 06 february  2021 energy news issue   1403  by khaled al awadiNew base 06 february  2021 energy news issue   1403  by khaled al awadi
New base 06 february 2021 energy news issue 1403 by khaled al awadi
 
Personal statement on implementation of arror and kimwarer dams in emc
Personal statement on implementation of arror and kimwarer dams in emcPersonal statement on implementation of arror and kimwarer dams in emc
Personal statement on implementation of arror and kimwarer dams in emc
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
Joint Venture Proposal for Dredging Works in India
Joint Venture Proposal for Dredging Works in IndiaJoint Venture Proposal for Dredging Works in India
Joint Venture Proposal for Dredging Works in India
 
11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
 
Infrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalInfrastructure financing guide india netz capital
Infrastructure financing guide india netz capital
 
A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...
 
PROJECT PROFILE AKWAN
PROJECT PROFILE AKWANPROJECT PROFILE AKWAN
PROJECT PROFILE AKWAN
 
NewBase 594 special 30 April 2015
NewBase 594 special 30 April  2015NewBase 594 special 30 April  2015
NewBase 594 special 30 April 2015
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09
 
Future Trends in LNG Project Finance (2011)
Future Trends in LNG Project Finance (2011)Future Trends in LNG Project Finance (2011)
Future Trends in LNG Project Finance (2011)
 

Recently uploaded

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Recently uploaded (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 

Global cs ltr

  • 1. Dear Gentlemen, We have come across your details from website and learn about the activities and works experience in the field of petroleum engineering projects. Please be informed, our company and associates are involved in different segments of business, among those, Agency, Representation, and Tender Consultancy are being conducted by one of our company Global Consulting Services. We have experience to work with the overseas suppliers, manufacturers and contractors in the following sectors: (narrated briefly) 1. Railways: Supplied engineering items, locomotive spare parts, workshop equipment and permanent way materials to Bangladesh Railway; Our Principal and manufacturers were from Germany, U.S.A., Belgium and U.K. 2. Water supply and Sewerage System: Supply, Erection and Commissioning of heavy duty raw water VT pumps, (surface water), under turnkey contract to Chittagong WASA (water and sewerage authority). Manufacturer, supplier, erection and commissioning was done by Kirloskar Brothers Limited, Pune-India. 3. Steel Mills: Supplied and installed 24nos. continuous duty pumps to the reputed steel mills with spare and warranty maintenance. 4. Irrigation pumps: marketed substantial quantity of irrigation mono bloc pumps under rural electrification board programmed through dealer’s network across the country; 5. Experienced in participating many tenders of engineering products, Water supply project works pumps, electric motors, spare parts etc.. to the government and public sectors, some of those with successful completion. Please be informed, The Government of Bangladesh, intends to modernize her only crude petroleum refinery. As sequence of the project implementation, goes for global invitation for: “EXPRESSION OF INTEREST FOR FINANCING, BMRE Project of the EASTERN REFINERY”. Basic concept of BMRE: To increase its present capacity from 1.5million TPA to 4.5million TPA The feasibility study indicates that estimated cost of BMRE project is US$867.00million for the capacity of 3.00 million metric tons per annum. Out of which US$709.00 million will be in foreign currency and remaining US$158.00 million in local currency. The financial and economic analysis have been carried out for ERL BMRE project considering three different crude and crude mix processing options. The result of financial and economic analysis show that the project is highly attractive. The project generates an after tax return on fixed capital cost of 16.6% (20year average), while IFRR & IERR are around 20% and 23.5% respectively. The average annual foreign currency saving is US$220 million. The payback period of the investment is 4.5 years. For smooth transfer of crude oil a single point mooring and submarine pipe line are being constructed to connect the refinery storage. For SPM project, selection of Consultant is under process and expected completion time of SPM project is December 2012. Now the executing agency, on behalf of the GOB, invited proposal from global interested sources to submit proposal for financing this BMRE project on any of the following options: 1) Build-Own-Operate & Transfer (BOOT) 2) Public Private Partnership (PPP) 3) Financing only 4) Any other suitable option. The Expressions of Interest to be submitted by 10th August, 2010.
  • 2. We are looking for a competent company / organization / financer, interested to participate in this giant project. For your kind information we are maintaining good liaison and connections with the Concerned Ministry, Lead Agency and the higher ups and confident to work in this project with the team, as local associate. We await your response in this matter. Thanks and Regards Quazi Shamsud Tarique Global Consulting Services “Commercial Court” (5th floor) 95, Agrabad C/A Chittagong-4100, Bangladesh. Tel:880-31-720292, 713215, 725722 Fax:880-31-710066 e-mail:qstbiz@gmail.com; mumtazuddinahmed@msn.com